Jul 9, 2024 | Case Study, News

Using the Meridian-GWD system, our client saved over 8 hours of rig time compared to wireline-deployed gyros and reduced HSE risk.

“A 100% successful run in a high shock and vibration environment with no damage to the gyro sensors or shifts in calibration. Data quality was excellent, and value was created for our client.”

Download case study